Dubai's Luxury Malls
Painting Services in Gate Avenue DIFC
Painting Services in Gate Avenue DIFC by The MELLS. Interior and exterior painting by our own painters, with surfaces properly prepared, furniture fully protected and wet film thickness checked on every coat. Here, we paint overnight and match brand colours. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- 2 hours in Dubai
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Painting Services at a glance
| Service | Painting Services |
|---|---|
| Also searched as | Painters in Gate Avenue DIFC, painters near me in Gate Avenue DIFC, house painting in Gate Avenue DIFC |
| Location | Gate Avenue DIFC, Dubai |
| Property types | Boutiques and retail units |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | 1 to 2 days for most apartments and 3 to 6 days for most villas |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | Wet film thickness checked on every coat and an adhesion test at handover |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Two hours in Dubai for urgent work, planned work within 48 hours |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
A good paint finish is mostly preparation. Dubai walls move with heat, hairline cracks open at ceiling joints, and coastal air and irrigation mark exterior walls within a few seasons. We repair and prime before we paint, apply the system named in your quotation and leave the home clean enough to move straight back into.
- Colour consultation, with sample patches on your walls on request
- Furniture moved, wrapped and returned, with floors covered edge to edge
- Cracks opened, filled and sanded, and stains sealed
- Primer or sealer matched to the substrate
- Two finish coats in the agreed sheen, with clean cut lines at ceilings and trims
- Doors, frames, skirtings and ceilings on request
- Daily clean down and a final clean at handover
- Paint schedule with brand, colour codes and batch numbers
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey, colour and written scope. We measure, test the existing coating and agree colours, sheen and the number of coats. The written quotation names the paint system and the scope.
- Protection. Furniture is moved and wrapped, floors are covered edge to edge, and switches, handles and light fittings are masked or removed.
- Surface preparation. Walls are washed, flaking paint is scraped back, cracks are opened and filled, and everything is sanded flat. Damp or salt affected areas are treated before any paint goes on.
- Primer and finish coats. A sealer or primer suited to the substrate is followed by two finish coats. Wet film thickness is checked on every coat.
- Snagging and handover. We inspect in daylight with you, touch up, clean down and hand over a paint schedule listing brand, colour codes and batch numbers for future touch ups.
Painting Services in Gate Avenue DIFC: what we plan for
We paint retail units between closing and opening, protect fixtures and stock, and match the brand's colour references.
Retail painting is done overnight between trading days, with brand colours matched, displays protected and the unit clean and odour free before opening.
Work takes place before opening or after closing under a work permit from mall management. Staff IDs, insurance and method statements are submitted in advance, and access is through service corridors.
What your quotation depends on
A quotation for painting services in Gate Avenue DIFC follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Wall and ceiling area and ceiling height
- Condition of the surface and how much repair is needed
- Paint system, sheen and number of coats
- Colour changes, feature finishes and access equipment
Nearby in Dubai's Luxury Malls
Questions about painting services in Gate Avenue DIFC
What do painting services include?
Interior and exterior painting by our own painters, with surfaces properly prepared, furniture fully protected and wet film thickness checked on every coat. The work includes colour consultation, with sample patches on your walls on request; furniture moved, wrapped and returned, with floors covered edge to edge; cracks opened, filled and sanded, and stains sealed.
How much do painting services cost in Gate Avenue DIFC?
We do not publish prices, because no two jobs are the same. The main factors: wall and ceiling area and ceiling height; condition of the surface and how much repair is needed. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides painting services in Gate Avenue DIFC?
The MELLS provides painting services in Gate Avenue DIFC, Dubai. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long do painting services take?
Typically 1 to 2 days for most apartments and 3 to 6 days for most villas. The time for your property is confirmed with the quotation.
Which paint brands do you use?
We apply the paint system named in your quotation. Most clients choose premium washable emulsions from the major brands stocked in Dubai, and we are happy to work with paints specified by your designer.
How do you protect furniture and floors?
Furniture is moved to the centre of the room and wrapped. Floors are covered edge to edge, and fittings are masked or removed. The crew cleans down every day.
Do you repair cracks and damp patches before painting?
Yes. Cracks are opened, filled and sanded, and damp or salt affected plaster is treated and sealed first. Painting over a defect only hides it for a few months.
Do you arrange the mall work permit for Gate Avenue DIFC?
Yes. We submit the permit request, staff IDs, insurance and method statement to mall management before each visit.
Can you work to our brand's cleaning standards?
Yes. We follow your standards manual and report against it after every visit.
How do I choose a company for painting services in Gate Avenue DIFC?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (wet film thickness checked on every coat and an adhesion test at handover) and puts right any failed check free of charge within 48 hours.
Can you come to Gate Avenue DIFC at short notice?
Yes. Crews travel from our Barsha Heights base, and urgent work in Dubai is attended within two hours between 08:00 and 19:00, Monday to Saturday.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.