Waterproofing
Waterproofing in Bloom Gardens
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. The MELLS carries this out in Bloom Gardens with its own directly employed team and a named supervisor. We visit the property first and confirm the scope in a written quotation.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Waterproofing at a glance
| Service | Waterproofing |
|---|---|
| Also searched as | Waterproofing company in Bloom Gardens, roof waterproofing in Bloom Gardens, leak repair in Bloom Gardens |
| Location | Bloom Gardens, Abu Dhabi |
| Property types | Villas |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Abu Dhabi roofs bake for most of the year and then take a sudden downpour, which is when cracked membranes and blocked outlets show themselves. We trace the leak before recommending anything, prepare the surface, apply the membrane system named in your quotation and flood test it before any tile or screed goes back.
- Leak tracing with moisture readings and flood or dye tests
- Removal of failed membrane, loose screed and blown tiles
- Crack, joint and drain outlet repairs
- Liquid applied and sheet membranes matched to the surface
- Upstands, corners and pipe penetrations detailed
- Flood test before finishes are reinstated
- Screed, tiling and regrouting over the new membrane
- Building or community paperwork prepared where approval is needed
- Photographs of every layer in the handover report
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Waterproofing in Bloom Gardens: what we plan for
Bloom Gardens is a gated community near Al Salam Street, beside the Ministries Complex and the Eastern Mangrove coast. Its homes are Andalusian villas built around a central patio, Tuscan style villas with arched porches, semi detached villas and townhouses. Faya is a cluster of townhouses in the original community, and Aldhay, handed over in 2023, added two to five bedroom townhouses.
The mangrove coast to the east keeps the air humid for much of the year, and inner patios hold that moisture with little air movement. Traffic on Al Salam Street leaves a fine film on glass facing the road, and the hard water marks shower screens and outdoor taps. Courtyard humidity loads AC coils and drain pans, so these are cleaned at each service. Water heaters are descaled and pressure valves tested.
Entry is through a staffed gate, and the resident registers the crew and vehicle beforehand. Work on the outside of a home may need the community's consent. That is identified at the site visit and we prepare the paperwork requested.
What your quotation depends on
A quotation for waterproofing in Bloom Gardens follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Choose a service in Bloom Gardens
Each one has its own scope and method.
Waterproofing across Bloom Gardens
Questions about waterproofing in Bloom Gardens
What does waterproofing include?
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. The work includes leak tracing with moisture readings and flood or dye tests; removal of failed membrane, loose screed and blown tiles; crack, joint and drain outlet repairs.
How much does waterproofing cost in Bloom Gardens?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides waterproofing in Bloom Gardens?
The MELLS provides waterproofing in Bloom Gardens, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does waterproofing take?
Typically quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test. The time for your property is confirmed with the quotation.
How do you find where a leak is coming from?
We take moisture readings, inspect the area above and around the damp, and where needed run a flood or dye test on the suspect surface. The plumbing is pressure tested if a pipe is the likelier cause.
Can a bathroom be waterproofed without removing the tiles?
A clear sealer over tiles and grout can slow minor seepage, but it is not a membrane. Where water is reaching the room below, the tiles in the wet zone have to come up so the floor can be tanked properly.
How long does waterproofing last?
That depends on the membrane system, the exposure and how the surface is used. Your quotation names the system, and an exposed roof is worth inspecting before each summer.
How do your crews get access to Bloom Gardens?
Entry is through a staffed gate, and the resident registers the crew and vehicle beforehand. Work on the outside of a home may need the community's consent. That is identified at the site visit and we prepare the paperwork requested.
Do you work in the Aldhay townhouses?
Yes. Crews are registered at the gate by the resident, and visits run Monday to Saturday, 08:00 to 19:00, by appointment after a site visit.
How do I choose a company for waterproofing in Bloom Gardens?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Bloom Gardens arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.