Waterproofing
Waterproofing in Corniche Road
The MELLS provides waterproofing in Corniche Road with its own directly employed team. A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. A supervisor visits first, and the written quotation follows before any work begins.
- Quotation
- Written, after a visit
- Response
- By appointment
- Quality checks
- 14 on every job
- Service
- Gold rated
5.0 on GoogleFully insuredNo subcontractorsOpen 08:00 to 19:00, Monday to Saturday

Waterproofing at a glance
| Service | Waterproofing |
|---|---|
| Also searched as | Waterproofing company in Corniche Road, roof waterproofing in Corniche Road, leak repair in Corniche Road |
| Location | Corniche Road, Abu Dhabi |
| Property types | Apartments |
| Quotation | In writing, after a site visit and before any work begins |
| Typical duration | Quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test |
| Team | Crew directly employed by The MELLS, with a named supervisor |
| Quality check | A measured test for every job, with photographs before and after |
| If a check fails | It is put right free of charge within 48 hours |
| Response | Visits in Abu Dhabi by appointment, Monday to Saturday |
| Hours | 08:00 to 19:00, Monday to Saturday |
| Booking | Book a site visit on this page, call +971 55 444 0084 or email contact@themells.ae |
What is included
Abu Dhabi roofs bake for most of the year and then take a sudden downpour, which is when cracked membranes and blocked outlets show themselves. We trace the leak before recommending anything, prepare the surface, apply the membrane system named in your quotation and flood test it before any tile or screed goes back.
- Leak tracing with moisture readings and flood or dye tests
- Removal of failed membrane, loose screed and blown tiles
- Crack, joint and drain outlet repairs
- Liquid applied and sheet membranes matched to the surface
- Upstands, corners and pipe penetrations detailed
- Flood test before finishes are reinstated
- Screed, tiling and regrouting over the new membrane
- Building or community paperwork prepared where approval is needed
- Photographs of every layer in the handover report
How it works
The same method on every job, so the result does not depend on who is on shift.
- Survey and diagnosis. A technician inspects the system or surface, takes readings and photographs, and explains what was found in plain language.
- Written quotation. You receive a written quotation against a defined scope before any work starts. Anything outside that scope is quoted separately.
- Protected, supervised work. The work area is protected and isolated, and the job is carried out by our own technicians under a named supervisor.
- Testing. Every job ends with a measured test suited to the discipline, so the result is a reading and a photograph and not an opinion.
- Report and warranty. The completed report reaches you within the hour. Any failed point is put right free of charge within 48 hours.
Waterproofing in Corniche Road: what we plan for
The residential stretch of Corniche Road is a line of apartment towers facing the beach and the open sea, from Etihad Towers and Nation Towers at the western end to buildings such as Al Reef Tower, Bel Ghailam Tower, Wave Tower and Saraya One further along. Homes run from studios to large penthouses, many with full height glazing and balconies over the water.
Wind off the Gulf carries salt and fine sand straight onto Corniche facades and balconies. Glass loses its clarity within a week, aluminium frames pit, and balcony drains clog with sand. Upper floors catch strong wind, so sliding doors and their seals wear faster and let dust through. Most Corniche towers supply chilled water to fan coil units in each apartment. Coils, trays and filters are cleaned, drain lines flushed and the thermostat checked, so the unit stops dripping onto ceilings and smelling stale.
Every tower on the Corniche needs a work permit from building management and a booked service lift before work starts. Parking for service vans is limited, so loading times are agreed with the building. These rules are identified at the site visit, and we prepare the paperwork the building asks for.
What your quotation depends on
A quotation for waterproofing in Corniche Road follows a site visit. The supervisor looks at the points listed here and you receive a written quotation with a defined scope before any work begins. Once you accept it, nothing is added on the day.
- Size and type of the system or surface
- Present condition and ease of access
- Parts and materials specified
- One visit or a retained contract
Choose a service in Corniche Road
Each one has its own scope and method.
Waterproofing across Corniche Road
Questions about waterproofing in Corniche Road
What does waterproofing include?
A waterproofing company for villas, apartments and buildings, treating roofs, bathrooms, balconies, water tanks and pools once the leak is traced. The work includes leak tracing with moisture readings and flood or dye tests; removal of failed membrane, loose screed and blown tiles; crack, joint and drain outlet repairs.
How much does waterproofing cost in Corniche Road?
We do not publish prices, because no two jobs are the same. The main factors: size and type of the system or surface; present condition and ease of access. Book a site visit: a supervisor from The MELLS looks at the work and you receive a written quotation with a defined scope before anything begins.
Who provides waterproofing in Corniche Road?
The MELLS provides waterproofing in Corniche Road, Abu Dhabi. The work is carried out by people The MELLS employs directly, under a named supervisor, 08:00 to 19:00, Monday to Saturday. To arrange it, book a site visit on this page or call +971 55 444 0084.
How long does waterproofing take?
Typically quoted per project, typically 2 to 3 days for a bathroom and 3 to 7 days for a villa roof, including curing and a flood test. The time for your property is confirmed with the quotation.
The leak is coming from the apartment above. What can you do?
We inspect your ceiling, take readings and report the likely source with photographs. The repair itself has to be made in the unit above, so access is arranged through that owner or building management.
Do you provide waterproofing in Corniche Road?
Yes. We waterproof roofs, wet rooms, balconies, tanks and pools across Abu Dhabi. The first step is always a site visit to trace where the water is getting in.
How do you find where a leak is coming from?
We take moisture readings, inspect the area above and around the damp, and where needed run a flood or dye test on the suspect surface. The plumbing is pressure tested if a pipe is the likelier cause.
Do you arrange the building permit in Corniche Road?
Yes. Most buildings ask contractors for a work permit, trade licence, insurance and staff IDs, and a service lift booking. We submit all of it for you.
What days do you work on the Corniche?
Corniche appointments run Monday to Saturday between 08:00 and 19:00, subject to the building's own permitted hours for contractors, which we confirm before booking.
How do I choose a company for waterproofing in Corniche Road?
Ask four things: who employs the people who will come, whether the scope is written down before work starts, how the result is checked, and what happens if something is missed. The MELLS uses its own staff, quotes in writing after a site visit, checks every job (a measured test for every job, with photographs before and after) and puts right any failed check free of charge within 48 hours.
How are visits to Corniche Road arranged?
Visits in Abu Dhabi are booked by appointment between 08:00 and 19:00, Monday to Saturday. Call or send the form and we agree the earliest time a supervisor can come to you.
Page updated by The MELLS, Damac Executive Heights, Barsha Heights, Dubai.